Skip to content

Palm City, Martin County

Commercial painting in Palm City

Palm City has no town hall of its own, so the Martin County Building Department and Growth Management cover it. Inside the Old Palm City redevelopment area, around Martin Highway and Mapp Road, the county's Redevelopment Code bars black or fluorescent as the main exterior color on buildings over 450 square feet.

The code describes Old Palm City as a small-town setting where schools, small shops, neighborhood businesses, parks and the St. Lucie River sit within walking distance. Black trim, window frames, doors and accents remain allowed. A repaint that keeps the building's look does not pull a building into the design standards; a substantial change to the exterior can, and the Growth Management Director may allow partial compliance.

Away from the old center, Palm City's commercial buildings include offices, plazas and industrial parks. Outside the redevelopment areas, county Division 20 rules cover commercial buildings in the commercial land use categories: no black or fluorescent on a primary facade, and side walls finished to match the front.

The county's own permit page lists painting among projects that typically need no permit, while siding and stucco work is on the list that does. On a Palm City job, Romco separates the two in the scope, so any stucco repair large enough to need a permit is known before work starts.

Sources: Martin County LDR 12.1.12: redevelopment design standards · Martin County LDR 12.4.04: Old Palm City development standards · Martin County LDR 4.872: architectural design standards

Who reviews the work in Palm City

Martin County Building Department and Growth Management

Painting is on the county's list of typical projects that do not need a permit; siding and stucco work is on the list that does. Color limits come from the Land Development Regulations, administered by Growth Management.

Read the source

General information, not legal advice. Whether a repaint needs a permit or color approval depends on the building and the change; we confirm it with the issuing office first. Martin painting rules

What we quote in Palm City

Buildings we quote here

The order of work

Six steps, the same on every job

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single suite and a full condo community go through the same six steps.

  1. Send the building

    Phone us, or send the request form along with photos or plans. Say what gets painted, who stays inside and what decisions are already made.

  2. Walk it with us

    We inspect the walls, trim and metal, decide the access for each elevation, and note what nearby needs protection.

  3. Scope and quote in writing

    The quote lists the washing, repairs, coating system, access, phases and anything still waiting on an approval.

  4. Color and approvals

    The color is checked against the county or city rule, and any board vote, permit or airport clearance is settled first.

  5. Wash, repair, coat

    Washing, repairs, primer and finish follow the agreed order, with drains covered and people below kept clear.

  6. Walk-through and closeout

    We walk the work with you, finish the punch list and hand over a record of the coatings used.

Questions

Commercial painting in Palm City

Does a Palm City plaza repaint need county approval?

A repaint that restores the existing look generally does not, and painting is on the county's no-permit list. A color change on a primary facade must avoid black or fluorescent under county design rules. If the building is in the Old Palm City redevelopment area, ask Growth Management how its code applies.

How is the cost of a commercial paint job worked out?

From the building itself. We look at the surfaces and how worn they are, the stucco, sealant and rust repairs, the coating system, how each side is reached, who stays inside, and which color rules or board votes come first. Photos and drawings can start it; most quotes are confirmed with a walk. There is no rate card, because no two buildings wear the same way in this climate.

What happens if the building has lead paint?

Coatings put on before 1978 can hold lead. EPA's renovation rule covers work that disturbs it in pre-1978 housing and in child-occupied rooms such as a day care, and that work goes to a certified firm using lead-safe practices. We check the building's age and use first, and any abatement is coordinated with a licensed firm.

How long will the painting take?

We set the schedule after the walk, not before. It depends on the surfaces, the repairs found once the walls are washed, the summer rain, the access, any color approval and the hours the building or town allows. Instead of a date nobody controls, you get the sequence and the dependency behind each step.

Other Martin cities: Stuart · Jensen Beach · Hobe Sound · Port Salerno · Hutchinson Island · Jupiter Island · Sewall's Point · Indiantown · Ocean Breeze · Unincorporated Martin County · Rio · Golden Gate

From a Stuart storefront to an Indiantown plant, quoted at any size

Send the address and the surfaces. Romco will scope and quote it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One storefront or a whole community: each job gets a written scope and a quote.

Call (772) 310-3298Request a quote